Project Info

Construction of the MultiTrade Institute (MTI) in Samangan Employer: Ministry of Education (DMTVET), Islamic Republic of Afghanistan (IRA)Represented by: PEM ConsultFunding Agency: KfW Development Bank, GermanyDuration: October 31, 2019 – April 23, 2021Location: Samangan Province, AfghanistanCompany Role: Prime Contractor Project Overview: The Construction of the MultiTrade Institute (MTI) in Samangan was a strategically important project … Continue reading Samangan MTI Construction Project
  • Client : PEM-Consult
  • Category : Building Construction, Completed
  • Duration : 2020
  • Website : www.pem-consult.de
  • Project Location : Samangan Province, Afghanistan.

Project Info

Construction of the MultiTrade Institute (MTI) in Samangan

Employer: Ministry of Education (DMTVET), Islamic Republic of Afghanistan (IRA)
Represented by: PEM Consult
Funding Agency: KfW Development Bank, Germany
Duration: October 31, 2019 – April 23, 2021
Location: Samangan Province, Afghanistan
Company Role: Prime Contractor


Project Overview:

The Construction of the MultiTrade Institute (MTI) in Samangan was a strategically important project designed to enhance vocational and technical education infrastructure in northern Afghanistan. Funded by KfW Germany and implemented under the supervision of PEM Consult on behalf of the Ministry of Education (DMTVET), the project aimed to provide a modern, fully equipped institute capable of delivering a wide range of technical and vocational training programs.

As Prime Contractor, our company was responsible for the full execution of civil works, structural engineering, and the provision of necessary facilities and equipment, ensuring that all work was completed in accordance with international standards and seismic safety regulations.


Scope of Work:

The project included the construction of three major buildings and several ancillary structures across the institute’s campus:

  • Two-Floor Administrative and Laboratory Building

    • Ground Floor: Administrative offices

    • First Floor: Laboratories and technical workshops

  • Three-Floor Academic Building

    • Floors 1–3: 28 classrooms

    • Third Floor: Multipurpose hall for events and training activities

  • Single-Story Ancillary Buildings:

    • Automotive workshop

    • Male and female toilet facilities

    • Technical service unit

    • Guard house

    • Water tower


Design & Technical Specifications:

All buildings were constructed with modern design principles and resilience in mind. Key specifications included:

  • Earthquake-resistant structural design

  • Reinforced concrete (RFC) skeleton structure

  • Roofing system: Profile steel sub-structure with 7° sloped trapezoidal sandwich panels

  • Openings: High-quality PVC windows and steel doors


The completion of the MTI in Samangan now provides a state-of-the-art educational environment, supporting the development of practical skills among Afghan youth and contributing to long-term socio-economic development in the region.

Expert Team

Lorem ipsum dolor sit amet, consect etur adipiscing elit their labore.

Free Consultation

Lorem ipsum dolor sit amet, consect etur adipiscing elit their labore.

Lowest Cost

Lorem ipsum dolor sit amet, consect etur adipiscing elit their labore.

Project Result & Benefits

The Construction of the MultiTrade Institute (MTI) in Samangan plays a vital role in strengthening the technical and vocational education system in northern Afghanistan. By providing modern infrastructure, fully equipped classrooms, and specialized workshops, the institute enables young men and women to gain practical skills that meet the needs of the local and national labor markets. This project not only enhances access to quality education but also contributes to economic development by preparing a skilled workforce capable of driving growth in key sectors such as construction, mechanics, and technology.